Reliable
Team Snubbing International inc. The Definition of a job WELL done.
Team Snubbing International
Team Snubbing delivers reliable, safe, and cost-saving well-control services for global oil and gas operations. Our experienced crews, management, and equipment ensure efficient operations and minimize downtime.
To discuss our services, please give us a call or send us an email at any time.
Efficient and Cost-Saving Work Over and Completion Services
Team Snubbing International (TSI) delivers industry-leading, experienced crews, management, and equipment, ensuring efficiency, safety, and cost savings for global oil and gas operations. Hydraulic work overs, fishing operations, through-tubing, hot tapping, gate valve milling and cryogenic well freezing are among the wide range of services we provide.
Reliable and safe, Work Over and Completion Crews and Equipment
Team Snubbing International (TSI) provides a range of services for oil and gas operations, including on-shore and off-shore HWO services. Our experienced crews and state-of-the-art equipment ensure reliable and safe operations while saving costs. Currently two 340KHWU’s located in Alaska with the ability to provide 340K, 225K, 150K jacks globally. TSI is also a leading manufacturer of workover and completion equipment.
Why Snubbing Matters
In the dynamic landscape of oil and gas exploration, Snubbing services play a pivotal role. Whether it’s well maintenance, workovers, or completions, snubbing provides a safe and efficient solution.
Our Commitment
At Team Snubbing International, we’re passionate about introducing snubbing to Alaska. Our experienced team brings cutting-edge technology, safety protocols, and operational excellence. We’re not just entering a market; we’re shaping its future.
Work Areas
Team Snubbing International (TSI) has conducted a wide range or workovers and completions with its state-of-the-art equipment. Alaska, Gabon, Australia, and various other countries have been areas of work for TSI.

Alaska
Two complete 340K Hydraulic Workover Packages located in Nikiski, Alaska. These packages are available through our partnership with Petroleum Equipment and Service’s Inc. (PESI) for work through out the state. TSI-101 and TSI-102 have completed workovers, through tubing interventions, ESP change outs, gas lift installations, fishing, underbalanced (snubbing) interventions and P&A’s in the state. These interventions have been completed both on and off shore from the Cooke Inlet to the North Slope.

Gabon
Team Snubbing International (TSI) was originally awarded the service and manpower contract for Gabon in 2019. We have continually completed services trips for ESP change outs off the coast of Gabon. Annual maintenance of equipment and the design and fabrication of new ancillary equipment including a new gin pole for 2023 ensure that the client is always ready to have any work overs completed at a moments notice.
TSI-101
Hydraulic Workover Unit
- Compact footprint
- Reduced loads
- Efficient trip times
- ESG awareness integration
- Competent crewing and leadershisp
- Robust management system
- Advanced performance monitoring
TSI-102
Hydraulic Workover Unit
- Compact footprint
- Reduced loads
- Efficient trip times
- ESG awareness integration
- Competent crewing and leadershisp
- Robust management system
- Advanced performance monitoring
TSI-101
Pressure Tests, Kill & Bleed Off Systems
- Test pump & fluid for testing
- Pump, bleed off tank & lines
- Complete certified iron packages inclusive of coflex hoses
- Kill pump and fluid management options
Well Control
- 6 station closing unit with backup and remote panels located in work basket
- Snubbing packages available
- Extensive secondary (snubbing) accumulator system integral
- Extensive primary bop system and accumulator support packages
- 7-1/16” to 13 5/8” stack designs
- Shear ram included in all stack designs for 7 1/16” and 13 5/8” bops
TSI-102
Pressure Tests, Kill & Bleed Off Systems
- Test pump & fluid for testing
- Pump, bleed off tank & lines
- Complete certified iron packages inclusive of coflex hoses
- Kill pump and fluid management options
Well Control
- 5 station closing unit with backup and remote panels located in work basket
- Snubbing packages available
- Extensive secondary (snubbing) accumulator system integral
- Extensive primary bop system and accumulator support packages
- 7-1/16” to 13 5/8” stack designs
- Shear ram included in all stack designs for 7 1/16” and 13 5/8” bops
The Team Snubbing International Advantage
- Safety First: Snubbing minimizes the risk of blowouts, well kicks, and other hazardous incidents. By preventing uncontrolled wellbore pressure, it ensures the wellsite remains secure.
- Efficiency Redefined: Imagine reducing rig time significantly. With its ability to perform live well interventions, operators can avoid costly shutdowns and keep production flowing seamlessly.
- Versatility Unleashed: Snubbing adapts to various well conditions, including deviated wells, horizontal sections, and unconventional reservoirs. It’s the Swiss Army knife of well services.
- Environmental Responsibility: By minimizing flaring and reducing emissions during workovers, snubbing aligns with our commitment to sustainability.
Wells Completed
Meters Tripped
KMs Driven
Man Hours
*Since Jan 2023






