Equipment: TSI 102

Snubbing Operations. • P & A • Work over • Through tubing • Fishing • Milling • On land or Off shore

TSI 101 top

TSI-102 Hydraulic Workover Unit

Key Advantages

  • Compact footprint
  • Reduced loads
  • Efficient trip times
  • ESG awareness integration
  • Competent crewing and leadershisp
  • Robust management system
  • Advanced performance monitoring
Team Snubbing International Logo
TSI 102 closeup

TSI-102

Pressure Tests, Kill & Bleed Off Systems

  • Test pump & fluid for testing
  • Pump, bleed off tank & lines
  • Complete certified iron packages inclusive of coflex hoses
  • Kill pump and fluid management options

Well Control

  • 5 station closing unit with backup and remote panels located in work basket
  • Snubbing packages available
  • Extensive secondary (snubbing) accumulator system integral
  • Extensive primary bop system and accumulator support packages
  • 7-1/16” to 13 5/8” stack designs
  • Shear ram included in all stack designs for 7 1/16” and 13 5/8” bops

Equipment Highlights

  • 340K Hydraulic Workover Unit/Snubbing Unit:
    • 12’ stroke
    • 7” or 13-5/8” configurations available
    • Medium duty capacity gin pole with counter balance winches
  • LMS (Load Management System)
  • 13” Work window
  • 13 5/8” x 10’ Work window
  • Serva SPM 600:
    • 3” x 6” stroke
    • 15,000 psi WP
  • 460,000lb rated substructure with stair towers
  • Trailer mounted doghouse & generator

  • Self contained fluid management system
  • Skid mounted ‘superchoke’ manifold
  • Degasser system

Job / Project Planning

The initiative for proper planning and execution utilizes our internal representations of 3D imaging, P&ID and BOP stack rendering, and Site layout.  These tools allow proper representation to our customers of end results for equipment placement and organization.